Avtokran-Tyumen LLC is one of the leading companies in Russia in the market for the provision of services for the lifting of heavy cargo.
Avtokran-Tyumen LLC was founded in 2011, during this time we have gained vast experience and can perform the most complex and extraordinary tasks using mobile cranes and crawler cranes.
When forming our own vehicle fleet, we included only the most reliable equipment, tested in practice in Russian climatic and road conditions. It is characterized by high performance and versatility.
Since 2017, our company has been actively involved and developing in the field of wind energy and at the moment is able to offer an integrated approach to the implementation of wind energy projects: starting from the design of a wind farm and up to preparation for commissioning.
The specialists of our company are GWO certified, which makes them qualified personnel with all the necessary competencies in the field of installation of wind turbines.
Reconstruction (refitting) of the flare unit.
Installation of flares 100 m high, installation of capacitive equipment weighting 84 tons.
Project for the development and reconstruction of reservoir equipment.
The Adygeya wind farm is located on the border of Shovgenovsky and Giaginsky regions of the Republic of Adygeya. It is Rosatom's first wind power facility and the largest wind power plant in the country as of 2020.
The wind farm comprises 60 wind turbines with the capacity of 2.5 MW each. The total capacity of the wind farm is 150 MW.
The height of the wind turbine with the rotor is 150 m. The blade length is 50 m, the weight is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.
Avtokran-Tyumen LLC performed a full range of works on this site: modular assembly, mechanical and electrical installation and follow-up of commissioning.
Marchenkovskaya wind farm is located in the Zimnikovskiy district of Rostov region comprising 48 wind turbines with the capacity of 2.5 MW each.
Installed capacity of the wind farm is 120 MW. The height of the wind turbine with the rotor is 150 m. The blade length is 50 m, the weight is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.
Avtokran-Tyumen LLC performed a wide range of works on the site including installation and follow-up of commissioning and ensured a high-level of performed works in adverse weather conditions typical for winter period in this region.
The Yamal LNG project was implemented on the Yamal Peninsula beyond the Arctic Circle on the basis of the Yuzhno-Tambeyskoye field.
Kochubeevskaya wind farm The wind farm is located in the Kochubeevsky district of the Stavropol Territory. As of today it is the largest operating wind power plant in Russia. There are 84 wind turbines with the capacity of 2.5 MW each. Total power output of the wind farm is 210 MW.
The height of the wind turbine with the rotor is 150 m. The blade length is 50 m, the weight is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.
Avtokran-Tyumen LLC was one of the key Russian partners in construction and performed a full range of works on the site: modular assembly, mechanical and electrical installation and follow-up of commissioning.
The Karmalinovskaya wind farm is located in the Novoaleksandrovsky urban district of the Stavropol Territory consisting of 24 wind turbines with the capacity of 2.5 MW each. Total capacity is 60 MW
The height of the wind turbine with the rotor is 150 m. The blade length is 50 m, the weight of each is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.
Avtokran-Tyumen LLC as the basic partner in construction and commissioning performed a full range of works on the site including installation and follow-up of commissioning.
Bondarevskaya wind farm is situated in Ipatovsky urban district of the Stavropol Territory. On September 1, 2021 the wind farm started supplying electricity to the national’s unified grid. This is the 3rd NovaWind JSC wind power plant in Stavropol region.
It comprises 48 wind turbines with the capacity of 2.5 MW each. The installed capacity of the wind power plant is 120 MW.
The height of the wind turbine with the rotor is 150 m. The blade length is 50 m, the weight of each is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.
Avtokran-Tyumen LLC was one of the key partners in installation and follow-up of commissioning.
The construction of the Medvezhenskaya wind farm started in January of 2021 in the Trunovsky municipal district of the Stavropol Territory.
The installed capacity of the wind farm is 60 MW comprising 24 wind turbines with the capacity of 2.5 MW each.
The height of the wind turbine with the rotor is 150 m. The blade length is 50 m, the weight of each is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.
Avtokran-Tyumen LLC is one of the basic partners at Medvezhenskaya wind farm in installation and follow-up of commissioning.
Berestovskaya wind farm is located in the Petrovsky district of the Stavropol Territory.
The installed capacity of the wind farm is 60 MW comprising 24 wind turbines with the capacity of 2.5 MW each.
The wind turbine with the rotor is 150 m high. The blade length is 50 m, and the weight is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.
Avtokran-Tyumen LLC was one of the basic partners to perform a full range of works at the site of Berestovskaya wind farm including installation and follow-up of commissioning.
The construction of a large wind farm Kuzminskaya in Kochubeevsky municipal district of the Stavropol Territory was completed.
The installed capacity of the wind farm will be 160 MW comprising 64 wind turbines with the capacity of 2.5 MW each. The planned average annual energy production is 378 million kWh.
The height of the wind turbine with the rotor is to be 150 m. The blade length will be 50 m, and the weight will be 8.6 tons. The tower weighs about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.
Avtokran-Tyumen LLC was a key contractor to perform installation and follow-up of commissioning of the wind turbines.
Trunovskaya wind farm is new project in the Stavropol Territory, in the construction of which Avtokran-Tyumen company participates as one of the key contractors.
The installed capacity of the wind farm is 95 MW. The site will have 38 wind turbines with a capacity of 2.5 MW each. The planned average annual energy production is 225 million kWh.
The height of the wind turbine at the Trunovskaya wind farm (together with the rotor) is 150 m. The length of the blades is 50 m, and the weight of each is 8.6 tons. The tower itself weighs about 200 tons, the generator - 52 tons. The total weight of the structure is approximately 320 tons.
Set of works to replace the internal devices of the reactor at the propane dehydrogenation unit.