Construction of wind farms
Read more
Service maintenance
of wind farms
Read more
Crawler cranes
Read more
Mobile cranes
Read more
Construction and installation
Read more
About us

Avtokran-Tyumen LLC is one of the leading companies in Russia in the market for the provision of services for the lifting of heavy cargo.

Avtokran-Tyumen LLC was founded in 2011, during this time we have gained vast experience and can perform the most complex and extraordinary tasks using mobile cranes and crawler cranes.

When forming our own vehicle fleet, we included only the most reliable equipment, tested in practice in Russian climatic and road conditions. It is characterized by high performance and versatility.

Since 2017, our company has been actively involved and developing in the field of wind energy and at the moment is able to offer an integrated approach to the implementation of wind energy projects: starting from the design of a wind farm and up to preparation for commissioning.

The specialists of our company are GWO certified, which makes them qualified personnel with all the necessary competencies in the field of installation of wind turbines.

Services
Wind industry
Construction and installation
Crane operation management plan development
Transport and logistics services
Crane services
Highlights
More than 390 wind turbines with a total capacity of over 980 mW were installed
More than 1.5 million tons transported by our cranes
The wind farms we have built help avoid emissions of more than 2.5 million tons of carbon dioxide per year
200+
Specialists for mechanical installation of wind turbines
60+
Electrical engineers
70+
Engineers and pieces of equipment for wind turbine commissioning
Our business partners
Our clients
Geographic reach
1
1
1
1
1
1
2
1
1
1
1
1
1
2
1
1
1
1
1
7
1
3
1
1
1
1
2
Almaty - Wind turbine installation
Anzhero-Sudzhensk - Yaya Refinery
A set of loading and unloading operations at the construction site of the Yaya oil refinery. Crane equipment with a lifting capacity of up to 500 tons was involved.
Astana - Wind Park Ereymentau
It is situated in Akmola Region, about 156 km northeast of Astana. The wind park occupies the area of 60 hectares, consisting of 22 wind turbines with the capacity of 2.05 MW each. The rotor blade diameter is 93 m; the height of the tower is 85 m. Electricity generated is supplied to the National Power Grid (NPG) of Kazakhstan.
Bovanenkovo - Bovanenkovo gas field
Crane services, loading / unloading and installation works of large amounts of machinery.
Evo-Yakhinskoye GCF - Evo-Yakhinskoye GCF
Lifting of the flare unit, installation works.
Reconstruction (refitting) of the flare unit.
Irkutsk region - Verkhnechonskoe OGCF
Kamensk-Uralskiy - RUSAL Kamensk-Uralskiy
Kamensk-Uralskiy - UAZ
Krasnodar Territory - Ilsky Oil Refinery named after A.A. Shamar
Krasnoyarsk Territory - Achinsk Oil Refinery of the Eastern Oil Company
Nizhny Tagil - JSC UralVagonZavod
Installation of the cold box (weighing 54 tons) and cryogenic tanks (weighing 35 tons).
Novy Port - Novy Port gas field
Renovation of high-pressure flares.
Installation of flares 100 m high, installation of capacitive equipment weighting 84 tons.
Novy Urengoy - CGTP Arktikgaz, Achimgaz
Technical upgrade and reconstruction of well clusters (piping).
Project for the development and reconstruction of reservoir equipment.
Pavlodar - Pavlodar Oil Chemistry Refinery
Perm region - JSC Metafrax Chemicals
Perm region - JSC Uralorgsintez
Pestsovoye OGCF - Pestsovoye OGCF
Dismantling of the upper sections of the flare shaft and metal structures, installation of new elements, electrical installation and commissioning.
Petropavlovsk - Wind turbine installation
Adygeya - Adygeya wind farm

The Adygeya wind farm is located on the border of Shovgenovsky and Giaginsky regions of the Republic of Adygeya. It is Rosatom's first wind power facility and the largest wind power plant in the country as of 2020.

The wind farm comprises 60 wind turbines with the capacity of 2.5 MW each. The total capacity of the wind farm is 150 MW.

The height of the wind turbine with the rotor is 150 m. The blade length is 50 m, the weight is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.

Avtokran-Tyumen LLC performed a full range of works on this site: modular assembly, mechanical and electrical installation and follow-up of commissioning.

Rostov region - Marchenkovskaya wind farm

Marchenkovskaya wind farm is located in the Zimnikovskiy district of Rostov region comprising 48 wind turbines with the capacity of 2.5 MW each.

Installed capacity of the wind farm is 120 MW. The height of the wind turbine with the rotor is 150 m. The blade length is 50 m, the weight is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.

Avtokran-Tyumen LLC performed a wide range of works on the site including installation and follow-up of commissioning and ensured a high-level of performed works in adverse weather conditions typical for winter period in this region.

Sabetta - Yamal LNG
Participation in construction of the liquefied natural gas plant.
The Yamal LNG project was implemented on the Yamal Peninsula beyond the Arctic Circle on the basis of the Yuzhno-Tambeyskoye field.
Stavropol Territory - Kochubeevskaya wind farm

Kochubeevskaya wind farm The wind farm is located in the Kochubeevsky district of the Stavropol Territory. As of today it is the largest operating wind power plant in Russia. There are 84 wind turbines with the capacity of 2.5 MW each. Total power output of the wind farm is 210 MW.

The height of the wind turbine with the rotor is 150 m. The blade length is 50 m, the weight is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.

Avtokran-Tyumen LLC was one of the key Russian partners in construction and performed a full range of works on the site: modular assembly, mechanical and electrical installation and follow-up of commissioning.

Stavropol Territory - Karmalinovskaya wind farm

The Karmalinovskaya wind farm is located in the Novoaleksandrovsky urban district of the Stavropol Territory consisting of 24 wind turbines with the capacity of 2.5 MW each. Total capacity is 60 MW

The height of the wind turbine with the rotor is 150 m. The blade length is 50 m, the weight of each is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.

Avtokran-Tyumen LLC as the basic partner in construction and commissioning performed a full range of works on the site including installation and follow-up of commissioning.

Stavropol Territory - Bondarevskaya wind farm

Bondarevskaya wind farm is situated in Ipatovsky urban district of the Stavropol Territory. On September 1, 2021 the wind farm started supplying electricity to the national’s unified grid. This is the 3rd NovaWind JSC wind power plant in Stavropol region.

It comprises 48 wind turbines with the capacity of 2.5 MW each. The installed capacity of the wind power plant is 120 MW.

The height of the wind turbine with the rotor is 150 m. The blade length is 50 m, the weight of each is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.

Avtokran-Tyumen LLC was one of the key partners in installation and follow-up of commissioning.

Stavropol Territory - Medvezhenskaya wind farm

The construction of the Medvezhenskaya wind farm started in January of 2021 in the Trunovsky municipal district of the Stavropol Territory.

The installed capacity of the wind farm is 60 MW comprising 24 wind turbines with the capacity of 2.5 MW each.

The height of the wind turbine with the rotor is 150 m. The blade length is 50 m, the weight of each is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.

Avtokran-Tyumen LLC is one of the basic partners at Medvezhenskaya wind farm in installation and follow-up of commissioning.

Stavropol Territory - Berestovskaya wind farm

Berestovskaya wind farm is located in the Petrovsky district of the Stavropol Territory.

The installed capacity of the wind farm is 60 MW comprising 24 wind turbines with the capacity of 2.5 MW each.

The wind turbine with the rotor is 150 m high. The blade length is 50 m, and the weight is 8.6 tons. The weight of the tower is about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.

Avtokran-Tyumen LLC was one of the basic partners to perform a full range of works at the site of Berestovskaya wind farm including installation and follow-up of commissioning.

Stavropol Territory - Kuzminskaya wind farm

The construction of a large wind farm Kuzminskaya in Kochubeevsky municipal district of the Stavropol Territory was completed.

The installed capacity of the wind farm will be 160 MW comprising 64 wind turbines with the capacity of 2.5 MW each. The planned average annual energy production is 378 million kWh.

The height of the wind turbine with the rotor is to be 150 m. The blade length will be 50 m, and the weight will be 8.6 tons. The tower weighs about 200 tons, the generator is 52 tons. The total weight of the structure is approximately 320 tons.

Avtokran-Tyumen LLC was a key contractor to perform installation and follow-up of commissioning of the wind turbines.

Stavropol Territory - Trunovskaya wind farm

Trunovskaya wind farm is new project in the Stavropol Territory, in the construction of which Avtokran-Tyumen company participates as one of the key contractors.

The installed capacity of the wind farm is 95 MW. The site will have 38 wind turbines with a capacity of 2.5 MW each. The planned average annual energy production is 225 million kWh.

The height of the wind turbine at the Trunovskaya wind farm (together with the rotor) is 150 m. The length of the blades is 50 m, and the weight of each is 8.6 tons. The tower itself weighs about 200 tons, the generator - 52 tons. The total weight of the structure is approximately 320 tons.

Tarko-Sale - Purovsky Gas Condensate Processing Plant
Installation of column equipment weighing up to 100 tons, installation of metal structures up to 70 m high.
Tobolsk - Tobolsk-Polymer Plant
Tobolsk - SIBUR Zapsibneftekhim
Set of construction and installation works for the replacement of the flare tip.
Set of works to replace the internal devices of the reactor at the propane dehydrogenation unit.
Tobolsk - Tobolsk river port
Tomsk - TomskNeftehim
The installation of the flare unit was completed. "Tomskneftekhim is one of the largest Russian polymer producers and a large industrial site of SIBUR.
Tyumen - JSC Antipinsky Refinery
Ust Kamenogorsk - Kazzinc
Amur region - "Vostochny" Spaceport
Complex of services on the construction of the facility: transportation, loading & unloading operations, installation of capacitive equipment weighing up to 75 tons
Chelyabinsk Region - Chelyabinsk
Chelyabinsk Region - Magnitogorsk

Согласие пользователя сайта на обработку персональных данных

Пользуясь сайтом, я (далее — Пользователь), свободно, своей волей и в своем интересе даю свое добровольное, мотивированное и информированное согласие обществу с ограниченной ответственностью «Автокран – Тюмень» (далее — Оператор), ИНН 7224045561, ОГРН 1117232028330, зарегистрированному по адресу: 625002 г. Тюмень, ул. Герцена 55, этаж 2, помещение 51-75, на автоматизированную и неавтоматизированную обработку моих персональных данных, в том числе с использованием сайта, находящегося по адресу в сети Интернет https://www.72kran.ru/ (далее — Сайт) в соответствии со следующим перечнем: фамилия, имя, отчество, адрес электронной почты, контактный телефон. С целью повышения осведомленности об услугах Оператора, предоставления релевантной рекламной информации, оптимизации рекламы, содействия в поиске работы и трудоустройстве. Оператор вправе осуществлять обработку персональных данных следующими способами: сбор, запись, систематизацию, накопление, хранение, уточнение (обновление, изменение), извлечение, использование, удаление, уничтожение персональных данных. Я ознакомлен и согласен с тем, что: